National Projects:

TOSHKA PROJECT NEW VALLEY IRRIGATION PROJECT :

HRI’s task is to make a preliminary design of the intake in Lake Nassar and the conduits and pump system which will have a capacity of 300m3/s to feed the New Valley (el-Waddy Al-Gadied) Canal.....Read more

New Assiut Barrage And Hydropower Model (Barrage Model):

Assiut is located 545 km downstream of Aswan High Dam and 375 km south of Cairo.Assiut Barrage was built in 1902 in order to divert Nile river flow to the Ibrahimia canal. .....Read more

Third Project:

Text.....Read more